This load consists of the load of any equipment, elements, and personnel which will be current on the mezzanine or tower for the duration of usual use. The DLL is set through the supposed use from the framework and it is a critical thought in the look method.Like rack-supported mezzanines, shelving-supported mezzanines are secured to existing shelv